Second Stage MME at Puerto Escondido Airport

Home > Success stories > Second Stage MME at Puerto Escondido Airport

Reinforced Soil Walls and Slope Reinforcement

2022

PUERTO ESCONDIDO - OAXACA - México

SICT OAXACA

HUAROCSO SA DE CV

HUAROCSO SA DE CV

Second Stage MME at Puerto Escondido Airport

Challenge

The erosive action of the stream flowing parallel to kilometer 137 on the federal highway Pinotepa Nacional – Salina Cruz has caused the undermining of the embankment, risking its stability. Additionally, the urban expansion brings a larger surface covered with asphalt and concrete, which have a lower infiltration coefficient, resulting in increased hydraulic expenditure, especially during hydro-meteorological events that affect this coastal city.

Solution

To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Paragrid 200 HF geogrids. Additionally, transverse deflector-type structures and two gabion weirs were included to control the slope of the channel. Also, an increased embedment depth was implemented for this wall, located in a high seismicity zone.

Used Products

MacRes混凝土面板
MacRes混凝土面板
马克菲尔MacRes 系统由高强度聚酯纱线制成,包含预制混凝土面板和 ParaWeb 增强层。表面覆盖聚乙烯涂层作为化学屏障,即使在高度侵蚀性的环境中也能最大限度地降低化学侵蚀的风险。 ParaWeb 加筋土与预制混凝土面板机械连接,主要用于基础设施和城市环境,作为传统垂直结构的替代物以保留土体,其View