Challenge

The Çöpler mine site is an open pit operation located 8 km away from Ilıc District of Erzincan City, approximately 550 km east of Ankara in Middle Anatolia with the capacity to process approximately 20,000 tonnes of oxide ore per day. During the extension of the waste storage area, rockfall from the rocky slopes next to the construction area forced the company to stop the construction temporarily in order to prevent damage on the membranes and to decrease the risk for the construction crew.

Solution

In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic conditions, Steel Grid HR100 has been installed on the steep slopes running along the waste storage area. The total area of approximately 30,000 m² has been installed in a time period of 4-6 weeks under the cooperation with our professional mountainer crew.

Used Products

MacWeb 加筋土系统
MacWeb 加筋土系统
由并列的格栅构成,通过挤压合成材料条(光滑、有纹理、有孔或无孔)形成蜂窝状结构。 主要应用于固定土壤或其他松散材料来控制侵蚀。 土工格主要安装在具有浅倾斜度的干燥和非植物土壤中;还可与对称土工格栅结合用于土壤稳定应用。View